
Add to Cart
Industrial insulated shed design prefabricated light weight building steel frame warehouse
Steel structure building is formed by the main framework through linking up the H beam and column, C purline, Z purline steel components. Roof and wall, which takes a variety of panels into use, combined with other components including windows and doors.
The obvious advantages of steel structure are as follows:
long span,
high yeild and tensile strength,
light weight,
low cost,
energy saving,
brilliant appearance,
efficient construction time,
effective insulation,
long life span,
space-efficiency,
good seismic performance,
flexible layout, etc.
Project scope:Industrial steel structure warehouse/hangar/Steel workshop/chicken poultry house/garage, container house, shed, prefabricated home, office buildings,exhibition hall, agricultural storage, multi-story building, logistic centers.
Steel Construction Description | ||
Main steel frame | Q345B | hot rolled H section or Steel Welded H Section |
Purlin | Q235B Q345B | C Section Steel or Z Section Steel |
Roof Cladding | Sandwich Panel Corrugated | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel Corrugated | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet |
Tie Rod | Q235B | Circular Steel Tube |
Brace | Q235B | Round Bar |
Column & Transverse Brace | Q235B | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Q235B | Angle Steel |
Roof Gutter | Q235B | Color Steel Sheet |
Rainspout | PVC | PVC Pipe |
Door | plastic steel Aluminum alloy | Open the door, sliding door, rolling door |
Windows | plastic steel Aluminum alloy | sliding windows |
High Strengthen Bolt | 45#,20MnTiB,35VB | Standard parts |
Why us ?
Quality control system
· Purchase material from famous steel manufacturer, supply traceable mill certificate.
· Before we use the material, we will make a third-party inspection,
· During fabricating, we have 5 QC to inspect every piece member.
· Before we load the steel into the container, we will arrange all the managers to check the steel member.
· Project Supervisor from customer will be welcomed during our fabrication.
· Pre-assembly will be available to check the quality and connection.
Technology service
Help customer to replace the foreign material by chinese material , Modify the shop drawings by chinese material ( but need your qualified engineer check and confirm)
· Modify and optimise shop drawings to save time and money.
· Help you quote your project by free
· Answer your other technology questiones
Loading management
· Before loading we will arrange all the managers to check the goods ( quality and quantity).
· We will make the loading container list before our loading
· We have one manager to check the quantity during our loading containers
· Tie up all the member in case the damage during the sea transportation
· After loading containers, Every steel member ( serial no. from your drawings) will be marked in the loading container list, then we will send to you, you could check the container list to find every member.